SAP CO: Material Ledger with Inter and Intra company posting




SAP CO: Material Ledger with Inter and Intra company posting

This process with fully integrated with Material Ledger, Product Costing and Material Management and Sales and Distribution modules


SAP CO: Material Ledger fully integrated with Inter (Cross) company transitions with markup by additive cost and

Intra (with in the company) company posting via Group Valuation (by adding Markup-Additive cost) and Profit center valuation (by adding Markup-Transfer price)


1). Inter (Cross) company transitions with markup by Additive cost

Here material is transfer from different company code's plant to another company code's plant which means company code to company code indirectly.

For the above scenario PO and SO concept will fit and how accounting entries will generated with markup concept.

Material Ledger with Group Valuation will linking to the above scenario

Requirements for the above scenario

a). Delta Cost component-Company code

b). Costing type and Costing Variant

c). Special procurement key

d). Additive cost creation


2). Intra (with in)company transitions with markup by Transfer Price

Here material is transfer from same company code's plant to another plant which means plant to plant transfer concept.

For the above scenario STO (Stock transport order) will fit and how accounting entries will generated with Transfer pricing concept.

Material Ledger with Profit center Valuation will linking to the above scenario


Requirements for the above scenario

a). Delta Cost component-Profit center

b). Costing type and Costing Variant

c). Special procurement key

d). Transfer price


Group Valuation-Additive cost with "Inter company" and Profit center Valuation-"Transfer Pricing" with "Intra company"

Url: View Details

What you will learn
  • Material Ledger Setup with Legal Valuation, Group Valuation and Profit center Valuation
  • Material Ledger Setup-Group Valuation-Inter company transaction with Markup say as Additive Cost
  • Material Ledger Setup-Profit center Valuation-Intra company transaction with Markup say as Transfer price

Rating: 4.75

Level: Expert Level

Duration: 7 hours

Instructor: Karanam Sreedhar


Courses By:   0-9  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z 

About US

The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of course-link.com.


© 2021 course-link.com. All rights reserved.
View Sitemap