SAP CO Product Costing-"By Order Scenario" in S/4 HANA 1909
SAP CO Product Costing-"By Order Scenario" in S/4 HANA 1909
1. Organization Structure-Configuration
2. Financial Accounting Settings-Configuration
3. CO Basic- Org Settings-Configuration
4. Material Management Settings-Configuration
5. Sales and Distribution Settings-Configuration
6. Production Planning Settings-Configuration
7. FI-MM-SD Settings-OBYC and VKOA-Configuration
8. CO-Cost Component Structure-Configuration
9. Costing Sheet - Template allocation Configuration
10. Costing Variant -Valuation Variant-Configuration
11. Product Cost by Order-Costing, Valuation Variants, Variance and Settlement -Configuration Settings
12. Work In Process (WIP) Configuration Settings
13. Master data-Cost center-Cost element-Activity type-SKF
14. Material Ledger Configuration ( It is mandatory in S4/HANA system).
15. KP46-KP26-KP06
16. Splitting Structure-Mapping- Configuration Settings
17. Cost Split Configuration and Activity type plan rate calculation- KSS4-KSPI
18. BOM-Work Center-Routing-CK11N-Standard Costing
19. Business Partner(Vendor) Creation-Purchase Order creation-Goods Receipt of INPUT Materials
20. Preliminary Costing, Simultaneous Costing with Production Order AND Month End Closing
21. CK40N-Standard Costing-Multiple Production Orders creation and postings with Month End Closing
22. Work in process-Variance Calculation
==================================================================================
new topics added
SAP CO S/4 HANA 2021 -Product Costing Techniques:
Product costing by order (Make to Stock)
Product costing by Sales order (Make to Order)-
Product costing without sales controlling vaulted stock
Product costing with Sales order controlling vaulted stock
Product costing with sales order controlling non-vaulted stock
Product costing by period
Repetitive manufacturing without reporting points consideration
Repetitive manufacturing with reporting points (work in process) consideration
Decoupling scenario (Integration of PP-Manufacturing order & Product cost collector).
Joint Production Process
CO-Product costing process
By Product Costing Process
Mixed Costing process- Split Valuation
For Raw materials with multiple purchasing procedure (Procurement)
For Semi Finished materials both process as Purchasing and Manufacturing process.
For Finished materials with multiple manufacturing lines process.
Sub-Contracting, External Operations Product costing process and
Cross plants –Special Procurement product costing
Additives cost estimation and
Scrap Costing: Assembly scrap, Component scrap and Operation Scrap.
SAP S/4 HANA 2021: Other "Product Costing Scenarios added to this course.
Url: View Details
What you will learn
- Organization Structure-Configuration.
- Financial Accounting Settings-Configuration.
- CO Basic- Organizational Structure Settings-Configuration
Rating: 4.45
Level: Expert Level
Duration: 71.5 hours
Instructor: Karanam Sreedhar
Courses By: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
About US
The display of third-party trademarks and trade names on this site does not necessarily indicate any affiliation or endorsement of course-link.com.
View Sitemap